NORFOLK (May 8, 2017) The aircraft carriers USS Dwight D. Eisenhower (CVN 69), pre-commissioning unit aircraft carrier Gerald R. Ford (CVN 78) and USS George Washington (CVN 73) sit pierside at Naval Station Norfolk. (U.S. Navy photo by Mass Communication Specialist 3rd Class Dartez C. Williams/Released)
Welcome to the Milcom Monitor Post sponsored by Teak Publishing (Copyright © 2006-2023 Teak Publishing). All rights are reserved. Redistribution of these pages in any format without prior permission is prohibited. Links to individual stories are permitted without permission. The comment section on this blog is closed, but you can pass along material or comments via email MilcomMP at gmail dot com. If you submit material for this blog and want to remain anonymous, indicate that in your message.
Milcom Monitoring Post Profiles
- Home
- What are Emergency Action Messages (EAM)? Updated 20 September 2021
- UFO Milsat Program
- Fleetsatcom System
- UHF 225-380 MHz Milcom Spectrum Holes: Updated 24 July 2019
- Civilian Air Cargo/Airline/Military Call Signs
- Intl HF Aero Civ/Gov/Mil Frequency List
- USN Aircraft Modex Numbers
- University of Twente Wide Band WebSDR Netherlands
- U.S. Military ALE Addresses
- DoD Air Refueling Frequencies - Update 15 Jul 2016
- COTHEN HF Network – Last Update 23 May 2023
- Monitoring the Civil Air Patrol Auxiliary Update 10 Sep 2016
- US Coast Guard Asset Guide - Update 24 May 2023
- The Spectrum Monitor e-Zine Milcom Column Index - Update 17 January 2022
- The Milcom MT Files (1998-2013) Articles Index
Showing posts with label Naval Station Norfolk. Show all posts
Showing posts with label Naval Station Norfolk. Show all posts
Tuesday, May 09, 2017
Three Navy carriers in port at Norva
NORFOLK (May 8, 2017) The aircraft carriers USS Dwight D. Eisenhower (CVN 69), pre-commissioning unit aircraft carrier Gerald R. Ford (CVN 78) and USS George Washington (CVN 73) sit pierside at Naval Station Norfolk. (U.S. Navy photo by Mass Communication Specialist 3rd Class Dartez C. Williams/Released)
Sunday, August 18, 2013
USS Arlington Hosts NASA Space Craft Recovery Tests
By Mass Communication Specialist 1st Class Eric Brown, U.S. Fleet Forces Command, Public Affairs
NORFOLK, Va. (NNS) -- After three days of practice, NASA conducted a stationary recovery test of their latest space craft, the Orion, in the well deck of the amphibious transport dock USS Arlington (LPD 24) while berthed at Naval Station Norfolk's Pier 12 on Aug. 15, 2013.
This successful test of the four-man, 16-foot capsule paves the way for future testing of NASA's Orion Program, including a West Coast underway recovery test in January, and the recovery of a low-orbit module following splashdown in the fall of 2014. NASA plans its first unmanned Orion voyage to take place in 2017, and a manned expedition in 2021.
"Arlington is all about ownership and standards, and Arlington is setting the standards for the other ships in our class that will be assisting in the recoveries of Orion space craft." said Arlington Commanding Officer Cmdr. Darren Nelson. "To be able to work with NASA on the next manned space capsule is a dream come true for many Arlington crew members - they are very excited about this unique opportunity."
Arlington Sailors and Marines assisting with the recovery in front of, adjacent to, and above the well deck throughout the week were joined by more than 75 NASA engineers, designers and technicians from Langley Research Center, Kennedy Space Center and Johnson Space Center.
The testing was overseen by NASA Recovery Director Louie Garcia.
"We performed the recovery several times earlier this week, and have gotten proficient at it," he said. "Today we did everything all together, perfecting the operation as if the capsule had left its orbit and splashed down, sending the small boats out to conduct a safety assessment, hook the taglines up and tow it into the well deck. The capsule was floated in over a cradle in the ballasted ship, and then settled into the cradle when the ship was deballasted.
"We have a requirement that we have the crew hatch opened within two hours of splashdown. We are trying to verify if that is a realistic goal, and so far it has been."
The U.S. Navy has worked with NASA with space craft recoveries for programs including Mercury (1959-1963), Gemini (1961-1966) and Apollo (1961-1972). The last recovery done by the U.S. Navy was in 1975.
Arlington's namesake predecessor, the major communications relay ship USS Arlington (AGMR 2) assisted with the recoveries of Apollo 8 in 1968, and 10 and 11 the following year.
"My crew and I are very proud to continue the legacy of Arlington and the NASA space program," Nelson said.
NASA has been planning the Orion recovery tests for more than five years.
The most challenging part of the Orion recovery was in the "choreography" of all the moving parts, Garcia said.
"We have never done this before, and we are working with Arlington, which of course has never done anything like this before either," he explained. "Also, we are working with people we've just met, and learning how to mesh different government organizations together so that their strengths and skills can accomplish the recovery of the capsule."
Arlington, a San-Antonio class warship, has many unique capabilities that make it an ideal partner to support NASA, including the ability to embark helicopters, launch and recover small boats, three dimensional air search radar and advanced medical facilities.
"This is a cost-effective partnership," Nelson noted. "The Navy has the necessary at-sea recovery experience and capabilities and is always willing to work with government and private partners when directed and when it makes the most sense in terms of capability and economy."
The recovery testing aboard Arlington has proven that the U.S. Navy can safely support NASA's requests for operational support without adversely impacting the Department of Defense's primary warfighting mission.
"This is a building block for the United States to conduct manned space flight again," Garcia said.
The ship is named for Arlington County, Va., home of the Pentagon, in honor of the 184 victims and heroes who lost their lives during the terrorist attack there on 9-11.
Arlington is the eighth in Navy's San Antonio class of ships, designed to be the most survivable amphibious vessels ever put to sea. The third in the U.S. fleet to bear the name, Arlington was be commissioned on April 6, 2013. The ship combines 21st century amphibious shipbuilding and warfighting technologies to support current and future
Marine Corps aircraft and landing craft, and will be capable of taking nearly 1,200 Sailors and Marines into harm's way.
This successful test of the four-man, 16-foot capsule paves the way for future testing of NASA's Orion Program, including a West Coast underway recovery test in January, and the recovery of a low-orbit module following splashdown in the fall of 2014. NASA plans its first unmanned Orion voyage to take place in 2017, and a manned expedition in 2021.
"Arlington is all about ownership and standards, and Arlington is setting the standards for the other ships in our class that will be assisting in the recoveries of Orion space craft." said Arlington Commanding Officer Cmdr. Darren Nelson. "To be able to work with NASA on the next manned space capsule is a dream come true for many Arlington crew members - they are very excited about this unique opportunity."
Arlington Sailors and Marines assisting with the recovery in front of, adjacent to, and above the well deck throughout the week were joined by more than 75 NASA engineers, designers and technicians from Langley Research Center, Kennedy Space Center and Johnson Space Center.
The testing was overseen by NASA Recovery Director Louie Garcia.
"We performed the recovery several times earlier this week, and have gotten proficient at it," he said. "Today we did everything all together, perfecting the operation as if the capsule had left its orbit and splashed down, sending the small boats out to conduct a safety assessment, hook the taglines up and tow it into the well deck. The capsule was floated in over a cradle in the ballasted ship, and then settled into the cradle when the ship was deballasted.
"We have a requirement that we have the crew hatch opened within two hours of splashdown. We are trying to verify if that is a realistic goal, and so far it has been."
The U.S. Navy has worked with NASA with space craft recoveries for programs including Mercury (1959-1963), Gemini (1961-1966) and Apollo (1961-1972). The last recovery done by the U.S. Navy was in 1975.
Arlington's namesake predecessor, the major communications relay ship USS Arlington (AGMR 2) assisted with the recoveries of Apollo 8 in 1968, and 10 and 11 the following year.
"My crew and I are very proud to continue the legacy of Arlington and the NASA space program," Nelson said.
NASA has been planning the Orion recovery tests for more than five years.
The most challenging part of the Orion recovery was in the "choreography" of all the moving parts, Garcia said.
"We have never done this before, and we are working with Arlington, which of course has never done anything like this before either," he explained. "Also, we are working with people we've just met, and learning how to mesh different government organizations together so that their strengths and skills can accomplish the recovery of the capsule."
Arlington, a San-Antonio class warship, has many unique capabilities that make it an ideal partner to support NASA, including the ability to embark helicopters, launch and recover small boats, three dimensional air search radar and advanced medical facilities.
"This is a cost-effective partnership," Nelson noted. "The Navy has the necessary at-sea recovery experience and capabilities and is always willing to work with government and private partners when directed and when it makes the most sense in terms of capability and economy."
The recovery testing aboard Arlington has proven that the U.S. Navy can safely support NASA's requests for operational support without adversely impacting the Department of Defense's primary warfighting mission.
"This is a building block for the United States to conduct manned space flight again," Garcia said.
The ship is named for Arlington County, Va., home of the Pentagon, in honor of the 184 victims and heroes who lost their lives during the terrorist attack there on 9-11.
Arlington is the eighth in Navy's San Antonio class of ships, designed to be the most survivable amphibious vessels ever put to sea. The third in the U.S. fleet to bear the name, Arlington was be commissioned on April 6, 2013. The ship combines 21st century amphibious shipbuilding and warfighting technologies to support current and future
Marine Corps aircraft and landing craft, and will be capable of taking nearly 1,200 Sailors and Marines into harm's way.
Subscribe to:
Posts (Atom)