Welcome to the Milcom Monitor Post sponsored by Teak Publishing (Copyright © 2006-2023 Teak Publishing). All rights are reserved. Redistribution of these pages in any format without prior permission is prohibited. Links to individual stories are permitted without permission. The comment section on this blog is closed, but you can pass along material or comments via email MilcomMP at gmail dot com. If you submit material for this blog and want to remain anonymous, indicate that in your message.
Milcom Monitoring Post Profiles
- Home
- What are Emergency Action Messages (EAM)? Updated 20 September 2021
- UFO Milsat Program
- Fleetsatcom System
- UHF 225-380 MHz Milcom Spectrum Holes: Updated 24 July 2019
- Civilian Air Cargo/Airline/Military Call Signs
- Intl HF Aero Civ/Gov/Mil Frequency List
- USN Aircraft Modex Numbers
- University of Twente Wide Band WebSDR Netherlands
- U.S. Military ALE Addresses
- DoD Air Refueling Frequencies - Update 15 Jul 2016
- COTHEN HF Network – Last Update 23 May 2023
- Monitoring the Civil Air Patrol Auxiliary Update 10 Sep 2016
- US Coast Guard Asset Guide - Update 24 May 2023
- The Spectrum Monitor e-Zine Milcom Column Index - Update 17 January 2022
- The Milcom MT Files (1998-2013) Articles Index
Saturday, March 28, 2009
Contracts awarded for TACAMO Digital NorthStar System
For my friends who monitor the widebands, the analog is going away and the system will be going digital. According to the information below by about 2011 we will go dark.
Rockwell Collins Inc., Richardson, Texas, is being awarded a $10,281,275 fixed firm price contract for approximately 37,250 man-hours of non-recurring engineering, installation, and testing in support of Phase four of the Internet Protocol and Bandwidth Expansion (IPBE) for the E-6B Take Charge and Move Out (TACAMO) aircraft. In addition, a total of three options with a total value of $7,678,423 are being exercised at time of award that includes an additional 40,900 man-hours of non-recurring engineering, installation, and testing. The purpose of the IPBE Phase 4 is
to install the Digital Northstar System on the E-6B aircraft to provide the aircraft with the necessary interoperability and the proper configuration to communicate with DNS ground sites. Work will be performed in Richardson, Texas, (69 percent); Cedar Rapids, Iowa, (18 percent); and Phoenix, Ariz., (13 percent), and is expected to be completed in Mar. 2011.
I hope to have more on this story in the June issue of Monitoring Times and my monthly Milcom column.